"100% inspected" is a phrase that appears in a lot of supplier documentation and means different things at different factories. On a sanitary pad line it usually refers to a specific set of instrumented checks, and it is worth knowing exactly which ones.
What inline systems reliably catch
Modern pad lines carry camera and sensor arrays that monitor a defined list of parameters continuously. The reliable ones are:
- Presence and position of components. Wings, release paper, acquisition layer, core — present, and in the right place.
- Registration. Print position and pattern alignment within tolerance.
- Foreign material and contamination. Visual detection of discoloration or debris on the web.
- Dimensional checks. Width and length of the finished profile.
- Fold and seal position. On folded and wrapped products, whether the fold landed where it should.
These are geometric and visual properties, and cameras are good at them. Units failing these checks are ejected automatically, and the count is logged.
What inline systems do not catch
Everything that requires load, time or destruction to assess:
- Absorbency and retention. Requires a liquid test on a sample, off-line.
- Rewet under pressure. Same.
- Adhesive bond strength. Destructive, off-line.
- Seam strength on pants. Destructive, off-line.
- Material basis weight. Measured by sampling, not continuously on most lines.
- Odour and hand feel. Human assessment.
This is not a weakness in the systems; it is the boundary of what can be measured non-destructively at line speed. The mistake is treating an inline pass as evidence about the second list.
How the two layers fit together
A functioning quality system has three layers, and a claim of quality should be traceable to all three:
- Inline. Continuous, geometric, 100% coverage of the parameters listed above.
- Batch sampling. Destructive and laboratory tests on a defined sampling plan — absorbency, rewet, bond strength, basis weight.
- Incoming material. Checks on rolls and adhesives before they enter the line, including certificates and spot verification.
Most disputes arise when a buyer assumes layer one covers a property that only layer two can verify. A conversation about which layer covers what, held before the order, prevents most of them.
Questions worth asking about inspection
- Which parameters are instrumented, and which are visual-only?
- What is the sampling plan for destructive tests? Units per batch, and which tests.
- Are reject counts recorded per shift, and available on request? A factory that can produce this data has a working system.
- What happens to ejected units? Destroyed and recorded is the correct answer; reworked is not.
The test layer, in numbers
The batch sampling layer is where the properties cameras cannot see get measured. The tests are standard across the industry; the acceptance values are product-specific and belong in the specification, not on a generic sheet:
| Test | Method | Acceptance |
|---|---|---|
| Absorbency rate | Timed liquid uptake on a defined volume | Seconds, limit set per product |
| Retention under load | Centrifuge or load cell after saturation | Grams retained, minimum |
| Rewet | Loaded filter paper under a defined weight | Grams, maximum |
| Bond strength | Peel test at a stated width | Newtons per 25 mm, minimum |
| Basis weight | Gravimetric on a cut area | gsm within a tolerance band |
What matters for a buyer is not the table itself but whether the numbers exist as numbers. A report that says "absorbency good" is not a test result; a report that says the sample took a stated volume in a stated time, against a stated limit, is.
How to read a reject log
Reject counts are the cheapest diagnostic a buyer has access to, and almost nobody asks for them. What a healthy log looks like:
- Counts by category, not a single total. Registration rejects and seal rejects point at different departments.
- Trend visible over weeks. Drift shows up as a slope, not as an alarm. A log that is flat at zero is not a good sign; it usually means nothing is being recorded.
- An action column. Every spike should have a name and a change next to it.
An unhealthy log has one number for the month, no categories, and no trend. That is not evidence of quality; it is evidence of reporting.
The quality documents guide lists the records worth requesting before an order, and the factory capability page describes the inspection equipment on site.
How large a sample actually is
Sampling plans are where "we test every batch" stops meaning anything. A batch of twenty thousand units tested on five of them is a spot check, not a statistical claim, and that is fine — as long as both sides know it is a spot check.
What makes it defensible is the schedule rather than the count. Three things turn five units per batch into evidence:
- A stated interval. Five units taken at the start and end of a run will miss a mid-run drift; five units spread across the run will catch it.
- A defined acceptance per test. Pass or fail against a number, recorded, not a comment.
- A reaction rule. What happens when a value falls outside. Stop, retest, hold, or release with a note — decided before the batch runs.
Buyers with a regulated channel usually add a fourth: a retained sample per batch, stored for a stated period. That costs a shelf and a labelling discipline, and it is the only way to answer a complaint about product made eight months earlier.
The quality control page describes how these three layers run in our plant, and the factory audit and evidence page covers what documentation a buyer can expect to receive.